04 August, 2008

Views of the completed structure

As I said in my last post the structure is now completed - all seven floors are erected and the roof has been poured. Fitting out is proceeding at a rapid pace. In summary:
  • Internal walls are almost erected to level 6
  • Services are roughed in to Level 6
  • Painting and tiling have begun on Levels 1 & 2
  • External surfaces are well advanced.
Here are two shots that give a sense of the shape and mass of the structure (even with scaffolding).

Photo 1: View of the northern facade from NIDA


Photo 2: View of the southern facade from the top of the L5 Building at UNSW


Share/Bookmark

No comments: