14 August, 2008

External finishing well underway

Progress continues to be good on the building. The following are some key indicators:
  • Structure complete
  • Internal walls largely completed levels 1-6 and well on the way to level 7 (top floor)
  • Services roughed in to level 7
  • Painting commenced on level 1
  • Preparation for tiling well advanced levels 1-4
  • External finishes well advanced
  • Acoustic screen to Anzac Parade commenced
  • Power sub station installed
The following photographs give a sense of the progress.

Above: Stockpiling tiles and other materials on the roof

Above: Granisite surfacing well under way (first 2 of 6 coats)


Above: Terrasite finishes commence on northern facade


Above: Main Common Room