- Structure complete
- Internal walls largely completed levels 1-6 and well on the way to level 7 (top floor)
- Services roughed in to level 7
- Painting commenced on level 1
- Preparation for tiling well advanced levels 1-4
- External finishes well advanced
- Acoustic screen to Anzac Parade commenced
- Power sub station installed
14 August, 2008
External finishing well underway
Progress continues to be good on the building. The following are some key indicators: